Monitoring from the day it lands.
Power on. Scan. Match. Live.
A module can be on site in weeks. The monitoring usually is not. Aravolta ships pre-configured, so the monitoring is live when the module is.
- 00:00bootpower on, config staged for MOD-07
- Found
- Template
- Live
- Queued
- Devices found
- 0
- Library matches
- 0
- Points mapped
- 0
- Queued
- 0
Library: 46,000+ make, model, and firmware versions
- Devices placed37 of 38 on the plan
- DashboardsPower, cooling, environment, network
- Alert rules52 applied
- TwinMOD-07 plan, 37 assets
- BaselineRecorded for commissioning
Click a device in the log or on the plan for its matched profile and points. Jump to a step, drag the bar, or replay.
2 to 4 weeks, not 6 to 12 months
Traditional DCIM takes 6 to 12 months to implement. Aravolta deploys on a modular site in 2 to 4 weeks, with automatic discovery and pre-built templates.
- Shortest
- Longest
Pre-configured for modular sites
Containerized halls repeat the same layouts, so most of the setup is done before the Aravolta node ships.
- Uplink
- Outbound only. The node accepts no inbound connections.
- Firewall
- No inbound ports to open and no rules to change.
- Probes
- SNMP 161/udpModbus 502/tcpBACnet 47808/udpRedfish 443/tcp
- Discovery
- The node scans the subnet on power-up and finds every device
- Network topology mapped automatically
- Pre-mapped layouts for common module designs
- Standard deployments configure themselves
- Templates
- Dashboards built for containerized halls
- Monitoring profiles for common module types
- Adjustable for a non-standard layout
- Integration
- SNMP, Modbus, and BACnet out of the box
- Connector kits for common equipment
- Integrations for Schneider, Vertiv, Huawei, and other module vendors
- Pre-integrated with common modular BMS platforms
- Cloud-hosted option for immediate access
The library holds more than 46,000 make, model, and firmware versions. A device we have not seen before is onboarded within 48 hours, at no cost.
Day-one visibility
What you see the first day, what you need to accept the module, and what carries on as the next ones arrive.
- Day one
Monitoring
- Power, cooling, and environmental readings from day one
- IT equipment found and monitored
- Capacity tracked as workloads land
- Alerts on critical faults
- Acceptance
Commissioning
- Check delivered performance against manufacturer specs
- Verify cooling and power distribution
- Record the baseline
- Acceptance test dashboards and reports
- Each new module
Phased rollout
- Add each module as it arrives
- One view across all modules
- Deployment progress against the schedule
- Faults caught early in the rollout
Deployment scenarios
Three cases where a module has to be monitored from the day it arrives.
Emergency and disaster recovery
- Fast deployment for disaster recovery
- Configurations staged ahead of time
- Remote monitoring from day one
- Quick capacity check and tuning
Temporary and seasonal capacity
- Fast deployment for peak periods
- Monitoring tied into the existing site
- A short decommissioning process
- Cost tracking for the temporary unit
Remote sites
- Fast deployment at remote locations
- Little technical skill needed on site
- Monitoring from headquarters
- Automated maintenance and alerting
One module or hundreds
One unit or a full campus, same setup.
- One dashboard for every module
- The same monitoring across module types
- Site-wide capacity and utilization
- Workload balancing across modules
- One set of operating procedures
Fully operational in weeks, including support for liquid cooled systems.